DYNAMIC LOAD CHART (DLC) – Predict to maximize

23 Apr 2018

Before to start working, you can see on the radio remote display the real loading capacity according to how you stabilized the crane. In fact, the Load chart calculates the crane performance on 360 ° operative radius and for each extension of the crane.
You can immediately know how much you can lift in a specific direction and know in advance the potentiality in the neighboring areas.
This feature of Progress 2.0 facilitates the operator work even in the most complex operating situations with a saving of time and major safety.

This Effer’s solution is patent pending.

 

GC023_3

 

 

GC023_1

Tags: